North Dorset District Council logo Hilton ChurchMilton Abbey and LakeRecycling CollectionPort Regis School
Menu End About your council| Caring| Enjoying| Learning| Living| Travelling| Working
Benefits Building Conservation & Design Planning & Building Control Council Tax Facts & Figures Housing Registrar Trading standards Recycling & Rubbish Emergency Planning
*
Development Control
Enforcement
Planning Policy
Building Control
 Customer Service Charter
 What are building regulations?
 Do I need approval?
 Types of application
 Completion
 Exempt works
 Building control charges
 Explanatory Booklets and Technical Links
 LABC Warranty
Sustainability
Land Charges
Council projects
Flooding
Contaminated Land
Audit Commission Reports

Building Notice

This form of application does not involve the passing or rejecting of plans. Therefore the preparation of full working drawings are not required and in some instances is designed to enable work to proceed quickly.

It is generally suited to small types of building work which can be considered non complex. If you decide to use this method you need to be confident that you or your builder are aware of the relevant Building Regulations and that the work will comply with the Regulations when inspected.

This method cannot be used for commercial buildings or buildings which require a fire certificate. This work must be submitted by the Full Plans Application route

The Building Notice procedure is suitable for the following types of work;

Small simple single storey extensions, Installation of boilers or other heating appliances, new chimneys or flues, replacement windows, detached garages, carports or sheds not exempt from the Regulations, installation of a bathroom, shower or WC, insertion of insulation to cavity walls, installation of drainage or connection to a sewer, replacing roofing material or internal structural alterations involving the removal of one or two walls.

Once you have submitted your Building Notice and informed us that you intend to start work we will inspect it as it progresses. You will be advised by your inspecting officer if the work does not comply. Sometimes before the work starts or during work in progress we may require further information such as structural design calculations or plans to help us check that the work complies, this information if requested must be supplied.

At the end of the process a Completion Certificate will be issued which is your record that satisfactory inspections have taken place.

Please call Building Control at North Dorset District Council on (01258) 484259/266 Fax (01258) 484265 or email us at buildcontrol@north-dorset.gov.uk for more details of this service.

Small Adobe Acrobat PDF icon Building Notice Form

Printer Friendly Version| Text Only Version| Privacy Policy| Accessibility Guidelines| Directgov| Top of Page